Å·ÃÀÈÕb´óƬ

Skip to Main Navigation

Documents for the 3rd ICP 2005 RC Meeting (May 17-21, 2004)

1. 
2. 
3. 
4.
5. Status report

  •  
  •  

6. Procedures to prepare Product Specifications  

7. Software  

8. Detailed project planning flowchart commissioned by AfDB  

    • Project planning
      •   (download full )
      • (download full )
      • (download full )
      • National coordinator (download full )
      •  (download full )

9. 
10. Finalization of the SPD process, preparation for Ring  

11.  

12.   


Api
Api